Help us Demolition the 2nd Floor
2nd-floor demolition started last summer with the removal of the appliances, bathroom fixtures, radiators, and scrap metal items, see pics. We now need to demo all the walls, floors, doors, ceilings, pipes, cabinetry, and wiring before we can install new plumbing and electrical need for the Masjid. As of #Ramadan 20, 1440 we have raised…